Skip to main content

24/7 AC service

Video · 0:37 · Apr 2026

Craning a new condenser onto a commercial roof

A full AC system installation done clean and the right way. From start to finish, we focus on reliable work, attention to detail, and making sure everything runs the way it should.

Transcript

Full transcript

This clip has music and no narration. What it shows:

  • 0 to 0. An outdoor condensing unit on a raised stand on a flat roof.
  • 0 to 0. A crane lifts a condensing unit, strapped to its hook, over the edge of the roof.
  • 0 to 0. Inside a utility closet: an empty equipment stand above a water heater, where the indoor unit goes.
  • 0 to 0. Copper refrigerant connections being brazed, with a heat shield behind them.
  • 0 to 0. A digital gauge manifold and a vacuum pump connected to the system.
  • 0 to 0. The new condensing unit on its roof stand.
  • 0 to 0. The new air handler installed in the closet, above the water heater.

Talk to Service Shield

Florida license CAC1821225

CallText a TechSite visit